Stage 3 AnalysisBuild 10
Wanderlust Properties · Acquisition
Loading...

1. Pick a property

2. Pick walk(s) to include

Analyzing...

Checking for a saved review first — if one exists for these exact walk(s), it resumes right where you left off. Otherwise: transcribing narration and comparing against the current MasterMind. This can take a minute or two for a long walk.

3. Review discrepancies

Open Current MasterMind

This is an analysis tool only — nothing here writes to the MasterMind. Decide whether each finding is already addressed, requires you to update the MasterMind manually, should carry into report notes, or should be disregarded.

4. Evaluator concerns

Anything you clicked Add to Notes on during review is already dropped into the box below, with its evidence. Add your contractor context, choose the author, and save it. The AI will preserve the substance while professionally integrating it into the report and the final Open Questions section when it remains unresolved. Nothing here is written back to the MasterMind.

5. Finish up

Both of these read the MasterMind exactly as it stands right now — make sure any edits you've made directly in the sheet are saved first. Run either one, both, or come back later and run them again; nothing here locks the property.

Walkthrough Report — draft

This is a draft only — nothing has been written to Drive yet. Review it below, describe any correction in the box, and hit Regenerate as many times as you need, one correction at a time. Regenerate only changes what the correction addresses; everything else comes back exactly as it was. When it's right, hit Generate Final Report to create the actual Google Doc and PDF.

Make a correction

Select a correction type, then describe the requested change. You may add more than one correction by selecting another type.